On 21 July, Astlanda Ehitus OÜ and Transiidikeskuse AS concluded a contract for the design and construction works of a warehouse complex (three enclosed warehouses) at Muuga Harbour. The object is located at 5 Hoidla tee, Maardu.
The object will be completed in May 2017.